Janne Tuomikko

avatar
VP Business development and Sales

+358 10 830 2911

Blog Post by Janne Tuomikko

Janne Tuomikko June 10, 2019 10 min

HIGH-STRENGTH CONCRETE – BENEFITS AND PRODUCTION REQUIREMENTS

What distinguishes high-strength concrete from conventional mix designs, and why is it ...
Janne Tuomikko March 28, 2019 1 min

BAUMA - New Tecwill ARCAMIX concrete plant with even bigger 4,5 m3 batch size mixer.

New ARCAMIX concrete mixing plant with 4,5 m3 batch size mixer in BAUMA 2019 exhibition ...
Janne Tuomikko October 12, 2018 15 min

How to measure aggregate moisture in a concrete mixing plant?

Inaccurate measuring of aggregate moisture increases production costs One of the biggest ...
Janne Tuomikko August 16, 2018 3 min

Tecwill delivered a precast concrete plant to Estonia

VMT Betoon AS is a leading Estonian company in the field of ready mix and precast ...
Janne Tuomikko June 27, 2018 6 min

HOW LONG DOES IT TAKE TO INSTALL A CONCRETE MIXING PLANT?

Buying a concrete mixing plant is a significant investment, requiring a detailed analysis ...
Janne Tuomikko March 15, 2018 4 min

How do high quality components and availability affect the concrete production costs?

Uninterrupted concrete production with high quality components The basic idea behind all ...
Janne Tuomikko October 31, 2017 7 min

5 REASONS FOR A CONCRETE PLANT WITH THE “FLYING” AGGREGATE DOSING SYSTEM

A “flying” aggregate dosing and weighing system provides more benefits than any other ...
Janne Tuomikko June 21, 2017 3 min

Tecwill supplied a super mobile COBRA C80 concrete plant for a hydro electrical power plant project in Norway

Tecwill delivered the COBRA to the construction site of the Smibelg and Storåvat ...
Janne Tuomikko April 6, 2017 2 min

Mobile Cobra C80 to wind mill project

Kirkenes Ferdigbetong AS received the order to supply the concrete for foundations of a ...
< >